Banagher Precast Concrete

Stand E03
Established in 1949 Banagher Precast Concrete are experts in prestressed concrete bridge beams and reinforced precast , with facilities in Norfolk and Ireland we have the capacity to manufacture 2.5 km of bridge beams per week. We also provide precast infrastructure solutions from portals, arches, culverts, retaining walls, tunnel segments to bespoke solutions. In 2005 we developed the now industry standard W beam and then the MY beam in 2007 - the MY beam which is ideal for shorter spans is known internally as our 'Green beam' as it uses less concrete than other beam types. In 2020 we broke all records and manufactured the longest prestressed concrete bridge beam ever made in the UK or Ireland at 50 metres, each beam measured 2.5 metres high and weighed an impressive 155 tonnes - to find out more drop by our stand (E03). Our team of bridge beam engineers are available to assist with design & value engineering, our aim is to work with our Clients and their Consultants to design efficient structures which are therefore also more carbon friendly, contact us anytime: info@bancrete.com #ChallengeUs

Documents

Products

Prestressed Bridge Beams
Prestressed Bridge Beams
Banagher Precast Concrete detail, manufacture and deliver prestressed bridge beams to civil projects across the UK. We can provide a full range of bridge beams including: W, MY, TY, Box, Y, U nd SY. We can also provide precast parapets, piers and crossheads. Manufacturing precast since 1949 we have a team of specialist engineers to assist with value engineering and reducing carbon on projects. #ChallengeUs
Culverts
Culverts
Reinforced precast concrete culverts
Portals
Portals
Reinforced precast concrete U on U, portals and arches
Banagher W Beams (up to 50 metres)
Banagher W Beams (up to 50 metres)
Banagher Precast Concrete developed the W beam in 2015 for long spanning structures, in 2021 we manufactured the longest prestressed concrete beam in the UK & Ireland measuring an impressive 50 metres.
Crossheads
Crossheads
Precast crossheads for bridge bstructures
Double-Tees
Double-Tees
Banagher Precast Concrete are the only supplier of prestressed double-tees in the UK & Ireland, the perfect solution for MSCPs, buildings, reservoirs and encapsulations
Tunnel Segments
Tunnel Segments
Currently supplying the Silvertown Tunnel project with over 10,000 precast segments
Parapets
Parapets
Precast parapets for road & rail structures

Videos

Longest precast bridge beams UK & Ireland! Transporting our 50 metre Banagher W19 Beams
Transporting our record-breaking 50 metre W beams to site
Completed Precast Decking Twickenham Station April 18
MY beam installation at Twickenham Station rail overbuild
Plymouth Road UK, Banagher Precast Concrete for Story Construction
Plymouth Road Bridge beam installation
Eastern Bay Link Project Wales EBL Last Concrete Beam Lift
Final beam lift at Eastern Bay Viaduct - 120 W Beams
Rookery South ERF Construction - Banagher W Beam Installation
Rookery South bridge beam installation - showing the versatility of prestressed bridge beams for use in buildings