Stuart Moore

Technical Principal, Mott Macdonald

Stuart Moore is a Member of the Institution of Civil Engineers and during his 28 year career has worked on the analysis, design and construction of bridges and heavy civil engineering structures on projects in the UK and internationally.

Stuart is currently the HS2 MWCC SL4 bridge discipline lead and is responsible for the design of the Curzon Approach Viaducts, including the Curzon 2 Viaduct, for the Balfour Beatty VINCI Construction Joint Venture.

My Sessions at Bridges 2026

Wednesday 11 March 2026

11:30

HS2’s Curzon No. 2 Viaduct

11:30 - 11:50
  • Use of sophisticated digital tools to model and analyse a 150m-long high-speed rail bridge.
  • Design of the weathering steel Warren truss.
  • Complex launching methodology for the 4000t bridge.
  • Lateral frequency considerations.