Catherine Ramsden
Senior Director , Useful Studio and Useful Simple TrustCatherine Ramsden is Senior Director of Useful Studio and of the Useful Simple Trust, working across the inter-disciplinary groups of engineers, architects and sustainability consultants. She is a highly experienced designer in architecture, urbanism and in public realm including footbridges. Her lean design approach and social purpose is fuelled by a passion for efficiency and positive impact.
The early years of her career focussed on planning and urban design in California followed by a decade at Foster + Partners leading on projects to include the Millennium Bridge. Current work, with LTC and the low carbon gantries as well as the integration of salvaged steel in bridges and buildings, continue this mission for lean and positive outcomes. Catherine sits on the Strategic Design Panel for National Highways and is on the Executive Committee of the UK IABSE and a member of the Net Zero Bridges Group. With a commitment to education, Catherine sits on the Dean’s Council at the University of Pennsylvania Weitzman School of Design, is an External Examiner at the University of Westminster School of Architecture + Cities and regularly lectures on circularity.
My Sessions at Day 2
Thursday 11 March 2027
Beyond the Bridge: Transferable Technologies Shaping the Future of Infrastructure
Some of the most exciting advances in bridge engineering didn’t start in bridge engineering. Sensors from offshore energy, data platforms from rail, construction methods from manufacturing, and digital tools from aerospace are reshaping how we design, build, monitor, and maintain structures. Meanwhile, the drive to net zero is changing what gets transferred: not only technologies and ideas, but the materials themselves, with salvaged steel finding new life in bridges and buildings. This opening session brings together leaders from across infrastructure and design to explore which technologies and approaches are crossing sector and disciplinary boundaries, and what it takes to adopt them at scale.
Panellists will discuss:
- Technologies from other industries already transforming bridge design, construction, and asset management
- How bridge innovations, from accelerated construction to remote monitoring, are being applied across wider infrastructure
- Reuse and lean design: integrating salvaged steel, designing low carbon structures, and doing more with less material
- The barriers to adoption, including procurement, standards, risk appetite, and skills
- What owners, designers, and contractors need to do now to stay ahead